Assessment Year | 2001 |
---|---|
Principal Product | Fabricated Pipe |
NAICS |
n/a
|
SIC | 3498: Fabricated Pipe and Pipe Fittings |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
4,200,000
ft2
|
Annual Production | 200,000
pieces
|
Production Hrs. Annual | 3,432
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $221,417 | 3,017,400 |
kWh
|
$0.073 |
Electricity Demand | $88,217 | 15,697 |
kW-mo/yr
|
$5.62 |
Electricity Fees | $(-34,141.0) | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,919 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,296 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $745 | - |
$356
6,638
kWh
|
$360
-
kW-mo/yr
|
$29 | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,623 | $4,047 |
$1,492
27,784
kWh
|
$1,030
-
kW-mo/yr
|
$101 | - | |
03 | 2.7134: Use photocell controls | $1,539 | $162 |
$1,096
14,820
kWh
|
$384
-
kW-mo/yr
|
$59 | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $628 | $780 |
$603
8,166
kWh
|
- | $25 | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,759 | $2,340 |
$1,689
22,888
kWh
|
- | $70 | - | |
06 | 3.5313: Increase amount of waste recovered for resale | $5,625 | - | - | - | - |
$5,625
-
lb
|
|
TOTAL RECOMMENDED | $12,919 | $7,329 |
$5,236
80,296
kWh
|
$1,774
-
kW-mo/yr
|
$284 |
$5,625
-
lb
|
||
TOTAL IMPLEMENTED | $10,296 | $3,282 |
$3,744
52,512
kWh
|
$744
-
kW-mo/yr
|
$183 |
$5,625
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs