ITAC Assessment: LL0107
ITAC logo
ITAC Assessment: LL0107
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Corrugated and solid fiber boxes
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $50
M
to 100
M
# of Employees 140
Plant Area 194,230
ft2
Annual Production 100,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $464,715 8,065,600
kWh
Electricity Demand $80,720 16,144
kW-mo/yr
Electricity Fees $15,847 -
Natural Gas $294,416 67,589
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,243 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,200

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings
01 2.3212: Optimize plant power factor $4,924 $7,874 $4,924
-
kW-mo/yr
- - - -
02 2.1116: Improve combustion control capability $33,119 $18,760 - - $33,119
-
MMBtu
- -
03 2.8114: Change rate schedules or other changes in utility service $16,897 - - $16,897 - - -
04 3.5212: Regrind, reuse, or sell scrap plastic parts $1,407 - - - - - $1,407
-
lb
05 3.5131: Recycle white water $25,896 $175,000 - - - $25,896
-
gal
-
TOTAL RECOMMENDED $82,243 $201,634 $4,924
-
kW-mo/yr
$16,897 $33,119
-
MMBtu
$25,896
-
gal
$1,407
-
lb
TOTAL IMPLEMENTED $44,200 $175,000 - $16,897 - $25,896
-
gal
$1,407
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs