ITAC Assessment: LL0104
ITAC logo
ITAC Assessment: LL0104
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Wood doors and widows
NAICS
n/a
SIC 2541: Wood Office and Store Fixtures, Partitions, Shelving, and Lockers
Sales Range $10
M
to 50
M
# of Employees 118
Plant Area 118,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 0
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,848 489,404
kWh
Electricity Demand $12,016 2,354
kW-mo/yr
Electricity Fees $1,434 -
Natural Gas $2,276 573
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,974 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,511

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,463 $3,417 $873
17,032
kWh
$534
-
kW-mo/yr
$56 - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,104 $206 $1,063
19,941
kWh
- $41 - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,621 $182 $1,561
29,287
kWh
- $60 - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,906 $4,522 $1,271
23,573
kWh
$562
-
kW-mo/yr
$73 - -
05 4.231: Purchase equipment instead of leasing $4,880 $1,000 - - - - $4,880
06 3.1192: Reduce scrap production $3,000 - - - - $3,000 -
TOTAL RECOMMENDED $13,974 $9,327 $4,768
89,833
kWh
$1,096
-
kW-mo/yr
$230 $3,000 $4,880
TOTAL IMPLEMENTED $12,511 $5,910 $3,895
72,801
kWh
$562
-
kW-mo/yr
$174 $3,000 $4,880
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs