ITAC Assessment: NC0321
ITAC logo
ITAC Assessment: NC0321
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Gelatin capsules for drugs
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 98,000
ft2
Annual Production 1,000,000,000
pieces
Production Hrs. Annual 8,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $306,186 11,031,688
kWh
Electricity Demand $176,185 18,440
kW-mo/yr
Electricity Fees $14,880 -
Natural Gas $324,511 45,301
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,114 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,287

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Primary Raw Material Savings
01 3.2172: Use automatic cleaning equipment $23,071 $15,000 $(-92.0)
(-3,271)
kWh
- $9,573
-
MMBtu
$13,590
-
Tgal
-
02 2.4239: Eliminate or reduce compressed air usage $5,185 $5,475 $2,580
92,160
kWh
$2,605
-
kW-mo/yr
- - -
03 2.1133: Adjust burners for efficient operation $19,559 $3,000 - - $19,559
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $696 $50 $305
10,880
kWh
$153
-
kW-mo/yr
- - $238
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,543 $1,070 $1,690
60,343
kWh
$853
-
kW-mo/yr
- - -
06 2.7135: Install occupancy sensors $60 $179 $60
2,158
kWh
- - - -
TOTAL RECOMMENDED $51,114 $24,774 $4,543
162,270
kWh
$3,611
-
kW-mo/yr
$29,132
-
MMBtu
$13,590
-
Tgal
$238
TOTAL IMPLEMENTED $27,287 $9,545 $4,270
152,503
kWh
$3,458
-
kW-mo/yr
$19,559
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs