Assessment Year | 2025 |
---|---|
Principal Product | Deli Items |
NAICS | 311612: Meat Processed from Carcasses |
SIC | 2013: Sausages and Other Prepared Meat Products |
Sales Range | $50 M to 100M |
# of Employees | 95 |
Plant Area |
55,000
ft2
|
Annual Production | 16,000,000
lb
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $408,450 | 4,084,499 |
kWh
|
$0.10 |
Electricity Demand | $143,062 | 16,831 |
kW-mo/yr
|
$8.50 |
Electricity Fees | $2,604 | - |
|
- |
Natural Gas | $284,760 | 61,016 |
MMBtu
|
$4.67 |
TOTAL YEARLY COSTS | $838,876 | |||
RECOMMENDED SAVINGS* | $120,609 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,457 | $100 |
$4,867
48,672
kWh
|
$1,590
-
kW-mo/yr
|
- | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $40,366 | $3,000 |
$33,634
336,336
kWh
|
$6,732
-
kW-mo/yr
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,485 | $7,000 |
$6,485
65,848
kWh
|
- | - | - | |
04 | 2.2622: Replace existing chiller with high efficiency model | $2,361 | $3,915 |
$2,114
21,137
kWh
|
$247
-
kW-mo/yr
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $2,195 | $4,000 |
$1,872
18,720
kWh
|
$323
-
kW-mo/yr
|
- | - | |
06 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $12,213 | $24,000 |
$9,204
92,040
kWh
|
$3,009
-
kW-mo/yr
|
- | - | |
07 | 2.9114: Use solar heat to make electricty | $43,842 | $126,000 |
$23,561
235,611
kWh
|
$306
-
kW-mo/yr
|
- | $19,975 | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,177 | $26,000 |
$4,655
46,550
kWh
|
$1,522
-
kW-mo/yr
|
- | - | |
09 | 2.2442: Preheat combustion air with waste heat | $513 | $2,500 |
$(-326.0)
(-3,259)
kWh
|
$(-76.0)
-
kW-mo/yr
|
$915
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $120,609 | $196,515 |
$86,066
861,655
kWh
|
$13,653
-
kW-mo/yr
|
$915
-
MMBtu
|
$19,975 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |