Assessment Year | 2025 |
---|---|
Principal Product | paper products |
NAICS | 322121: Paper (except Newsprint) Mills |
SIC | 2621: Paper Mills |
Sales Range | $10 M to 50M |
# of Employees | 84 |
Plant Area |
280,001
ft2
|
Annual Production | 109,591
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $490,521 | 8,175,374 |
kWh
|
$0.060 | |
Electricity Demand | $75,331 | 20,987 |
kW-mo/yr
|
$3.59 | |
Electricity Fees | $45,660 | - |
|
- | |
Natural Gas | $212,172 | 54,521 |
MMBtu
|
$3.89 | |
Waste Disposal Costs | |||||
Water Usage | $38,061 | 5,606 |
Tgal
|
$6.79 | |
Water Disposal | $30,963 | 2,580 |
Tgal
|
$12.00 | |
TOTAL YEARLY COSTS | $892,708 | ||||
RECOMMENDED SAVINGS* | $410,465 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,469 | - |
$4,905
81,744
kWh
|
$564
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,681 | $301 |
$1,494
24,898
kWh
|
$187
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,450 | $1,980 |
$6,681
111,355
kWh
|
$769
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,020 | $3,696 |
$8,986
149,760
kWh
|
$1,034
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 3.1181: Eliminate a by-product | $24,310 | $16,420 | - | - | - | - |
$8,710
-
Tgal
|
$15,600
-
Tgal
|
- | |
06 | 2.9112: Use solar heat to heat water | $58,205 | $636,222 |
$38,267
637,776
kWh
|
- | $19,938 | - | - | - | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $4,163 | $4,000 |
$3,905
65,083
kWh
|
$258
-
kW-mo/yr
|
- | - | - | - | - | |
08 | 2.2443: Re-use or recycle hot or cold process exhaust air | $3,163 | $4,000 | - | - | - |
$3,163
-
MMBtu
|
- | - | - | |
09 | 2.1224: Replace boiler | $109,410 | $550,000 | - | - | - |
$93,815
-
MMBtu
|
- | - | $15,595 | |
10 | 2.7232: Replace existing hvac unit with high efficiency model | $9,004 | $30,293 |
$8,649
144,144
kWh
|
$355
-
kW-mo/yr
|
- | - | - | - | - | |
11 | 2.4133: Use most efficient type of electric motors | $173,183 | $1,591,750 |
$160,119
2,668,647
kWh
|
$13,819
-
kW-mo/yr
|
- |
$(-755.0)
-
MMBtu
|
- | - | - | |
12 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,407 | $29,000 | - | - | - |
$4,407
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $410,465 | $2,867,662 |
$233,006
3,883,407
kWh
|
$16,986
-
kW-mo/yr
|
$19,938 |
$100,630
-
MMBtu
|
$8,710
-
Tgal
|
$15,600
-
Tgal
|
$15,595 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs