ITAC Assessment: LE0557
ITAC logo
ITAC Assessment: LE0557
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Optical Communication Equipment
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $100
M
to 500
M
# of Employees 60
Plant Area 225,000
ft2
Annual Production 15,000,000
units
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,030,966 23,735,810
kWh
Natural Gas $1,043,988 84,968
MMBtu
TOTAL YEARLY COSTS $4,074,954
RECOMMENDED SAVINGS* $913,567 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $279,544 - - - $279,544 -
02 2.7261: Install timers and/or thermostats $87,150 $3,000 $87,150
680,861
kWh
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,494 $100 $2,494
19,481
kWh
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $35,783 $9,500 $35,783
279,552
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $197,906 $323,780 $197,906
1,546,138
kWh
- - -
06 2.2622: Replace existing chiller with high efficiency model $291,977 $600,000 $291,977
2,281,072
kWh
- - -
07 2.1233: Analyze flue gas for proper air/fuel ratio $9,463 $29,000 - $9,463
-
MMBtu
- -
08 2.4112: Install soft-start to eliminate nuisance trips $9,250 $37,000 - - - $9,250
TOTAL RECOMMENDED $913,567 $1,002,380 $615,310
4,807,104
kWh
$9,463
-
MMBtu
$279,544 $9,250
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs