ITAC Assessment: LE0545
ITAC logo
ITAC Assessment: LE0545
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Injection Molded Parts
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 150,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $411,231 2,996,681
kWh
Electricity Demand $61,353 8,516
kW-mo/yr
Electricity Fees $14,539 -
Natural Gas $26,323 2,854
MMBtu
TOTAL YEARLY COSTS $513,446
RECOMMENDED SAVINGS* $36,399 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,908

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $2,922 $570 $2,922
21,334
kWh
- -
02 2.6212: Turn off equipment during breaks, reduce operating time $17,466 $15,150 $17,466
127,487
kWh
- -
03 2.2443: Re-use or recycle hot or cold process exhaust air $1,260 $1,500 - - $1,260
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $1,520 $2,000 $1,418
10,354
kWh
$102
-
kW-mo/yr
-
05 2.7232: Replace existing hvac unit with high efficiency model $7,441 $31,059 $6,840
49,929
kWh
$601
-
kW-mo/yr
-
06 2.2614: Use cooling tower or economizer to replace chiller cooling $5,790 $27,000 $5,589
40,802
kWh
$201
-
kW-mo/yr
-
TOTAL RECOMMENDED $36,399 $77,279 $34,235
249,906
kWh
$904
-
kW-mo/yr
$1,260
-
MMBtu
TOTAL IMPLEMENTED $21,908 $17,720 $21,806
159,175
kWh
$102
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs