Assessment Year | 2023 |
---|---|
Principal Product | Injection Molded Parts |
NAICS | 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
150,000
ft2
|
Annual Production | 1,000,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $411,231 | 2,996,681 |
kWh
|
$0.14 |
Electricity Demand | $61,353 | 8,516 |
kW-mo/yr
|
$7.20 |
Electricity Fees | $14,539 | - |
|
- |
Natural Gas | $26,323 | 2,854 |
MMBtu
|
$9.22 |
TOTAL YEARLY COSTS | $513,446 | |||
RECOMMENDED SAVINGS* | $36,399 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,908 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $2,922 | $570 |
$2,922
21,334
kWh
|
- | - | |
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $17,466 | $15,150 |
$17,466
127,487
kWh
|
- | - | |
03 | 2.2443: Re-use or recycle hot or cold process exhaust air | $1,260 | $1,500 | - | - |
$1,260
-
MMBtu
|
|
04 | 2.4221: Install compressor air intakes in coolest locations | $1,520 | $2,000 |
$1,418
10,354
kWh
|
$102
-
kW-mo/yr
|
- | |
05 | 2.7232: Replace existing hvac unit with high efficiency model | $7,441 | $31,059 |
$6,840
49,929
kWh
|
$601
-
kW-mo/yr
|
- | |
06 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $5,790 | $27,000 |
$5,589
40,802
kWh
|
$201
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $36,399 | $77,279 |
$34,235
249,906
kWh
|
$904
-
kW-mo/yr
|
$1,260
-
MMBtu
|
||
TOTAL IMPLEMENTED | $21,908 | $17,720 |
$21,806
159,175
kWh
|
$102
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs