ITAC Assessment: LE0544
ITAC logo
ITAC Assessment: LE0544
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Chemical Processing
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 70,000
ft2
Annual Production 800,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $433,811 8,168,400
kWh
Electricity Demand $69,492 27,284
kW-mo/yr
Electricity Fees $6,004 -
TOTAL YEARLY COSTS $509,307
RECOMMENDED SAVINGS* $56,399 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,184

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Increase in Production Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,946 $100 $3,821
72,100
kWh
$1,125
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,153 $11,000 $10,983
207,222
kWh
$3,170
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,870 $2,400 $1,452
27,413
kWh
$418
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,184 $4,100 $2,756
52,000
kWh
$428
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,260 $9,128 $5,209
98,296
kWh
$1,051
-
kW-mo/yr
-
06 2.4221: Install compressor air intakes in coolest locations $986 $2,000 $591
11,147
kWh
$395
-
kW-mo/yr
-
07 2.2437: Recover waste heat from equipment $25,000 $120,000 - - $25,000
TOTAL RECOMMENDED $56,399 $148,728 $24,812
468,178
kWh
$6,587
-
kW-mo/yr
$25,000
TOTAL IMPLEMENTED $3,184 $4,100 $2,756
52,000
kWh
$428
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs