| Assessment Year | 1983 |
|---|---|
| Principal Product | THERMOMETERS |
| NAICS |
n/a
|
| SIC | 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products |
| Sales Range | $1 M to 5M |
| # of Employees | 43 |
| Plant Area |
n/a
|
| Annual Production | 300,000
pieces
|
| Production Hrs. Annual | 2,250
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $41,895 | 449,883 |
kWh
|
$0.093 |
| Natural Gas | $27,425 | 4,285 |
MMBtu
|
$6.40 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $16,236 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,946 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $6,583 | $4,300 |
$7,898
84,408
kWh
|
$(-1,315.0)
-
MMBtu
|
|
| 02 | 2.7492: Use proper thickness of insulation on building envelope | $6,290 | $18,216 | - |
$6,290
-
MMBtu
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,363 | $2,153 |
$4,105
47,479
kWh
|
$(-742.0)
-
MMBtu
|
|
| TOTAL RECOMMENDED | $16,236 | $24,669 |
$12,003
131,887
kWh
|
$4,233
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $9,946 | $6,453 |
$12,003
131,887
kWh
|
$(-2,057.0)
-
MMBtu
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs