ITAC Assessment: UD0106
ITAC logo
ITAC Assessment: UD0106
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product THERMOMETERS
NAICS
n/a
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $1
M
to 5
M
# of Employees 43
Plant Area
n/a
Annual Production 300,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,895 449,883
kWh
Natural Gas $27,425 4,285
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,236 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,946

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $6,583 $4,300 $7,898
84,408
kWh
$(-1,315.0)
-
MMBtu
02 2.7492: Use proper thickness of insulation on building envelope $6,290 $18,216 - $6,290
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,363 $2,153 $4,105
47,479
kWh
$(-742.0)
-
MMBtu
TOTAL RECOMMENDED $16,236 $24,669 $12,003
131,887
kWh
$4,233
-
MMBtu
TOTAL IMPLEMENTED $9,946 $6,453 $12,003
131,887
kWh
$(-2,057.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs