ITAC Assessment: LE0542
ITAC logo
ITAC Assessment: LE0542
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Flexible Packaging
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 210,000
ft2
Annual Production 10,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $431,294 8,267,693
kWh
Electricity Demand $92,750 14,512
kW-mo/yr
Electricity Fees $43,799 -
Natural Gas $158,992 22,049
MMBtu
TOTAL YEARLY COSTS $726,835
RECOMMENDED SAVINGS* $48,964 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,699

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4221: Install compressor air intakes in coolest locations $3,677 $3,000 $3,121
60,011
kWh
$556
-
kW-mo/yr
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $26,690 $37,053 $22,843
439,294
kWh
$3,847
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,207 $1,900 $1,181
22,714
kWh
$26
-
kW-mo/yr
04 2.3212: Optimize plant power factor $5,492 $12,810 - $5,492
-
kW-mo/yr
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,898 $60,000 $11,054
212,576
kWh
$844
-
kW-mo/yr
TOTAL RECOMMENDED $48,964 $114,763 $38,199
734,595
kWh
$10,765
-
kW-mo/yr
TOTAL IMPLEMENTED $6,699 $14,710 $1,181
22,714
kWh
$5,518
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs