ITAC Assessment: LE0524
ITAC logo
ITAC Assessment: LE0524
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Recycled paper
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $100
M
to 500
M
# of Employees 78
Plant Area 240,000
ft2
Annual Production 322,120
ton
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,661,563 80,145,784
kWh
Electricity Demand $124,000 129,169
kW-mo/yr
Electricity Fees $185,700 -
Natural Gas $5,011,370 932,753
MMBtu
Waste Disposal Costs
Water Usage $694,380 103,212
Tgal
Water Disposal $2,283,069 188,457
Tgal
TOTAL YEARLY COSTS $11,960,082
RECOMMENDED SAVINGS* $2,541,734 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $609,889

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Water Consumption Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,559 $100 $2,487
54,053
kWh
$72
-
kW-mo/yr
- - - -
02 2.2442: Preheat combustion air with waste heat $131,350 $40,000 - - $131,350
-
MMBtu
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,133 $7,750 $16,655
362,058
kWh
$478
-
kW-mo/yr
- - - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $9,786 $5,740 $9,533
207,242
kWh
$253
-
kW-mo/yr
- - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $29,876 $25,340 $29,044
631,388
kWh
$832
-
kW-mo/yr
- - - -
06 2.4221: Install compressor air intakes in coolest locations $2,341 $2,100 $2,276
49,453
kWh
$65
-
kW-mo/yr
- - - -
07 2.2121: Increase amount of condensate returned $247,341 $500,000 - - $35,957
-
MMBtu
- $135,648
-
Tgal
$75,736
-
Tgal
08 3.1181: Eliminate a by-product $1,467,534 $3,000,000 $(-162,042.0)
(-3,424,512)
kWh
- $219,919
-
MMBtu
$505,064
-
Tgal
$904,593
-
Tgal
-
09 2.2121: Increase amount of condensate returned $166,416 $500,000 - - $29,191
-
MMBtu
$49,166
-
Tgal
$88,059
-
Tgal
-
10 2.1233: Analyze flue gas for proper air/fuel ratio $5,992 $24,000 - - $5,992
-
MMBtu
- - -
11 2.1224: Replace boiler $461,406 $4,000,000 - - $461,406
-
MMBtu
- - -
TOTAL RECOMMENDED $2,541,734 $8,105,030 $(-102,047.0)
(-2,120,318)
kWh
$1,700
-
kW-mo/yr
$883,815
-
MMBtu
$554,230
-
Tgal
$1,128,300
-
Tgal
$75,736
-
Tgal
TOTAL IMPLEMENTED $609,889 $4,047,750 $16,655
362,058
kWh
$478
-
kW-mo/yr
$592,756
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs