ITAC Assessment: LE0521
ITAC logo
ITAC Assessment: LE0521
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Machined Parts
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 4
Plant Area 55,000
ft2
Annual Production 10,000
units
Production Hrs. Annual 3,120
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,319 1,637,600
kWh
Electricity Demand $19,221 4,821
kW-mo/yr
Electricity Fees $2,621 -
Natural Gas $12,907 1,309
MMBtu
TOTAL YEARLY COSTS $181,068
RECOMMENDED SAVINGS* $51,339 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,933

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.8114: Change rate schedules or other changes in utility service $14,738 - $14,738
-
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $777 $35 $663
7,448
kWh
$114
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,021 $800 $885
9,940
kWh
$136
-
kW-mo/yr
-
04 2.2437: Recover waste heat from equipment $1,127 $1,200 - - $1,127
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,148 $2,956 $1,833
20,592
kWh
$315
-
kW-mo/yr
-
06 2.4221: Install compressor air intakes in coolest locations $410 $1,200 $350
3,931
kWh
$60
-
kW-mo/yr
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,237 $11,000 $2,762
31,034
kWh
$475
-
kW-mo/yr
-
08 2.7232: Replace existing hvac unit with high efficiency model $27,881 $128,814 $25,140
282,480
kWh
$2,741
-
kW-mo/yr
-
TOTAL RECOMMENDED $51,339 $146,005 $46,371
355,425
kWh
$3,841
-
kW-mo/yr
$1,127
-
MMBtu
TOTAL IMPLEMENTED $44,933 $131,249 $40,891
293,859
kWh
$2,915
-
kW-mo/yr
$1,127
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs