ITAC Assessment: LE0518
ITAC logo
ITAC Assessment: LE0518
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Cans
NAICS 332431: Metal Can Manufacturing
SIC 3411: Metal Cans
Sales Range $100
M
to 500
M
# of Employees 84
Plant Area 265,000
ft2
Annual Production 1,000,000,000
units
Production Hrs. Annual 8,736
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,178,010 19,009,361
kWh
Electricity Demand $147,730 26,907
kW-mo/yr
Electricity Fees $109,988 -
Natural Gas $744,589 162,650
MMBtu
TOTAL YEARLY COSTS $2,180,317
RECOMMENDED SAVINGS* $189,139 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $75,114

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,198 $2,600 $5,649
91,100
kWh
$549
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $6,190 $4,000 $5,533
89,241
kWh
$657
-
kW-mo/yr
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,790 $8,800 $6,027
101,206
kWh
$763
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,077 $30,000 $8,984
144,908
kWh
$1,093
-
kW-mo/yr
-
05 2.4226: Use / purchase optimum sized compressor $45,859 $175,000 $42,263
681,656
kWh
$3,596
-
kW-mo/yr
-
06 2.2441: Preheat boiler makeup water with waste process heat $114,025 $450,000 $(-6,122.0)
(-97,755)
kWh
- $120,147
-
MMBtu
TOTAL RECOMMENDED $189,139 $670,400 $62,334
1,010,356
kWh
$6,658
-
kW-mo/yr
$120,147
-
MMBtu
TOTAL IMPLEMENTED $75,114 $220,400 $68,456
1,108,111
kWh
$6,658
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs