ITAC Assessment: LE0516
ITAC logo
ITAC Assessment: LE0516
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Flexible Packaging
NAICS 326112: Plastics Packaging Film and Sheet (including Laminated) Manufacturing
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $50
M
to 100
M
# of Employees 255
Plant Area 65,000
ft2
Annual Production 20,000,000
units
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $182,201 6,210,044
kWh
Electricity Demand $56,484 11,551
kW-mo/yr
Electricity Fees $64,955 -
Natural Gas $139,881 32,033
MMBtu
TOTAL YEARLY COSTS $443,521
RECOMMENDED SAVINGS* $34,912 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,635

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,511 $200 $1,227
42,172
kWh
$284
-
kW-mo/yr
02 2.4221: Install compressor air intakes in coolest locations $1,124 $1,200 $1,104
37,067
kWh
$20
-
kW-mo/yr
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $14,984 $30,000 $14,700
506,882
kWh
$284
-
kW-mo/yr
04 2.2614: Use cooling tower or economizer to replace chiller cooling $8,448 $25,000 $6,859
236,511
kWh
$1,589
-
kW-mo/yr
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,118 $11,000 $2,556
88,153
kWh
$562
-
kW-mo/yr
06 2.7232: Replace existing hvac unit with high efficiency model $5,727 $36,000 $4,646
160,197
kWh
$1,081
-
kW-mo/yr
TOTAL RECOMMENDED $34,912 $103,400 $31,092
1,070,982
kWh
$3,820
-
kW-mo/yr
TOTAL IMPLEMENTED $2,635 $1,400 $2,331
79,239
kWh
$304
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs