ITAC Assessment: NC0210
ITAC logo
ITAC Assessment: NC0210
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Blow molded plastic containers
NAICS
n/a
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 38,000
ft2
Annual Production 200,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $294,574 11,340,500
kWh
Electricity Demand $209,680 22,077
kW-mo/yr
Electricity Fees $15,574 -
Natural Gas $8,478 1,088
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $280,745 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $809

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
01 2.6218: Turn off equipment when not in use $29,421 $50,000 n/a $19,530
630,000
kWh
$9,891
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $809 $592 $535
17,256
kWh
$274
-
kW-mo/yr
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,359 $137 $900
29,042
kWh
$459
-
kW-mo/yr
- - -
04 2.2515: Use optimum thickness insulation $1,930 $2,500 $1,112
36,129
kWh
$818
-
kW-mo/yr
- - -
05 2.7241: Install outside air damper / economizer on hvac unit $31,927 $70,000 $31,927
1,029,912
kWh
- - - -
06 2.7232: Replace existing hvac unit with high efficiency model $60,672 $400,000 $23,276
750,860
kWh
$12,396
-
kW-mo/yr
- $25,000 -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $148 $320 $98
3,160
kWh
$50
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $750 $551 $216
6,977
kWh
$110
-
kW-mo/yr
- $424 -
09 4.123: Reduce defects by reducing product tipping $32,100 $500 - - - - $32,100
10 4.522: Modify storage space to avoid rental of a warehouse $121,629 $400,000 $39
1,247
kWh
$990
-
kW-mo/yr
$60,000 $60,600 -
TOTAL RECOMMENDED $280,745 $924,600 $77,633
2,504,583
kWh
$24,988
-
kW-mo/yr
$60,000 $86,024 $32,100
TOTAL IMPLEMENTED $809 $592 $535
17,256
kWh
$274
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs