Assessment Year | 2001 |
---|---|
Principal Product | Blow molded plastic containers |
NAICS |
n/a
|
SIC | 3085: Plastics Bottles |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
38,000
ft2
|
Annual Production | 200,000,000
pieces
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $294,574 | 11,340,500 |
kWh
|
$0.026 |
Electricity Demand | $209,680 | 22,077 |
kW-mo/yr
|
$9.50 |
Electricity Fees | $15,574 | - |
|
- |
Natural Gas | $8,478 | 1,088 |
MMBtu
|
$7.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $280,745 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $809 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $29,421 | $50,000 | n/a |
$19,530
630,000
kWh
|
$9,891
-
kW-mo/yr
|
- | - | - |
02 | 2.4133: Use most efficient type of electric motors | $809 | $592 |
$535
17,256
kWh
|
$274
-
kW-mo/yr
|
- | - | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,359 | $137 |
$900
29,042
kWh
|
$459
-
kW-mo/yr
|
- | - | - | |
04 | 2.2515: Use optimum thickness insulation | $1,930 | $2,500 |
$1,112
36,129
kWh
|
$818
-
kW-mo/yr
|
- | - | - | |
05 | 2.7241: Install outside air damper / economizer on hvac unit | $31,927 | $70,000 |
$31,927
1,029,912
kWh
|
- | - | - | - | |
06 | 2.7232: Replace existing hvac unit with high efficiency model | $60,672 | $400,000 |
$23,276
750,860
kWh
|
$12,396
-
kW-mo/yr
|
- | $25,000 | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $148 | $320 |
$98
3,160
kWh
|
$50
-
kW-mo/yr
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $750 | $551 |
$216
6,977
kWh
|
$110
-
kW-mo/yr
|
- | $424 | - | |
09 | 4.123: Reduce defects by reducing product tipping | $32,100 | $500 | - | - | - | - | $32,100 | |
10 | 4.522: Modify storage space to avoid rental of a warehouse | $121,629 | $400,000 |
$39
1,247
kWh
|
$990
-
kW-mo/yr
|
$60,000 | $60,600 | - | |
TOTAL RECOMMENDED | $280,745 | $924,600 |
$77,633
2,504,583
kWh
|
$24,988
-
kW-mo/yr
|
$60,000 | $86,024 | $32,100 | ||
TOTAL IMPLEMENTED | $809 | $592 |
$535
17,256
kWh
|
$274
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs