ITAC Assessment: AS0545
ITAC logo
ITAC Assessment: AS0545
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product plastic caps
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 86
Plant Area 114,375
ft2
Annual Production 3,360,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $823,135 13,218,683
kWh
Electricity Demand $126,587 26,448
kW-mo/yr
Electricity Fees $105,667 -
Waste Disposal Costs
Water Usage $39,515 5,493
Tgal
TOTAL YEARLY COSTS $1,094,904
RECOMMENDED SAVINGS* $90,419 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9114: Use solar heat to make electricty $45,564 $673,751 $44,871
640,106
kWh
$693
-
kW-mo/yr
02 2.4224: Upgrade controls on compressors $40,798 $10,720 $34,912
572,508
kWh
$5,886
-
kW-mo/yr
03 2.7226: Use computer programs to optimize hvac performance $3,883 $1,698 $3,224
45,994
kWh
$659
-
kW-mo/yr
04 2.7272: Install heat pipes / raise cooling setpoint $174 $8 $142
2,325
kWh
$32
-
kW-mo/yr
TOTAL RECOMMENDED $90,419 $686,177 $83,149
1,260,933
kWh
$7,270
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs