Assessment Year | 1985 |
---|---|
Principal Product | BALL BEARINGS |
NAICS |
n/a
|
SIC | 3562: Ball and Roller Bearings |
Sales Range | $5 M to 10M |
# of Employees | 30 |
Plant Area |
n/a
|
Annual Production | 10,800,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $63,975 | 936,108 |
kWh
|
$0.068 |
Fuel Oil #4 | $22,106 | 3,744 |
MMBtu
|
$5.90 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $14,365 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,468 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #4 Savings |
---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $949 | $171 |
$1,062
15,533
kWh
|
$(-113.0)
-
MMBtu
|
|
02 | 2.7226: Use computer programs to optimize hvac performance | $7,976 | $8,800 |
$7,976
116,647
kWh
|
- | |
03 | 2.7492: Use proper thickness of insulation on building envelope | $3,897 | $1,850 | - |
$3,897
-
MMBtu
|
|
04 | 2.7122: Disconnect ballasts | $1,543 | $900 |
$1,543
22,567
kWh
|
- | |
TOTAL RECOMMENDED | $14,365 | $11,721 |
$10,581
154,747
kWh
|
$3,784
-
MMBtu
|
||
TOTAL IMPLEMENTED | $10,468 | $9,871 |
$10,581
154,747
kWh
|
$(-113.0)
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs