ITAC Assessment: LE0513
ITAC logo
ITAC Assessment: LE0513
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Pureed Food
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 90,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 5,200
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,855 1,890,493
kWh
Electricity Demand $18,323 4,983
kW-mo/yr
Electricity Fees $20,037 -
Natural Gas $14,752 1,686
MMBtu
LPG $15,560 1,210
MMBtu
TOTAL YEARLY COSTS $184,527
RECOMMENDED SAVINGS* $12,058 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,214 $1,500 $1,916
31,430
kWh
$298
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $1,153 $1,500 $998
16,357
kWh
$155
-
kW-mo/yr
-
03 2.2211: Use optimum temperature $1,846 $2,500 - - $1,846
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $362 $1,250 $314
5,148
kWh
$48
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,170 $9,500 $1,879
30,805
kWh
$291
-
kW-mo/yr
-
06 2.7232: Replace existing hvac unit with high efficiency model $4,313 $22,000 $3,982
65,279
kWh
$331
-
kW-mo/yr
-
TOTAL RECOMMENDED $12,058 $38,250 $9,089
149,019
kWh
$1,123
-
kW-mo/yr
$1,846
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs