ITAC Assessment: LE0509
ITAC logo
ITAC Assessment: LE0509
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Metal Fabrication
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 100,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 2,860
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,977 1,457,977
kWh
Electricity Demand $13,871 4,355
kW-mo/yr
Electricity Fees $12,926 -
Natural Gas $38,001 4,536
MMBtu
TOTAL YEARLY COSTS $149,775
RECOMMENDED SAVINGS* $10,866 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,259

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4239: Eliminate or reduce compressed air usage $1,607 $50 $1,470
25,344
kWh
$137
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,834 $2,500 $1,706
29,405
kWh
$128
-
kW-mo/yr
03 2.4226: Use / purchase optimum sized compressor $3,755 $56,400 $3,433
59,182
kWh
$322
-
kW-mo/yr
04 2.7232: Replace existing hvac unit with high efficiency model $2,037 $8,000 $1,893
32,640
kWh
$144
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,633 $9,000 $1,327
22,880
kWh
$306
-
kW-mo/yr
TOTAL RECOMMENDED $10,866 $75,950 $9,829
169,451
kWh
$1,037
-
kW-mo/yr
TOTAL IMPLEMENTED $9,259 $75,900 $8,359
144,107
kWh
$900
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs