ITAC Assessment: LE0504
ITAC logo
ITAC Assessment: LE0504
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Injection molded products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 174
Plant Area 158,000
ft2
Annual Production 30,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $165,376 3,059,199
kWh
Electricity Demand $36,294 7,482
kW-mo/yr
Electricity Fees $15,809 -
Natural Gas $8,853 1,298
MMBtu
TOTAL YEARLY COSTS $226,332
RECOMMENDED SAVINGS* $68,938 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $67,658

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Product Savings
01 2.4221: Install compressor air intakes in coolest locations $205 $500 $181
3,350
kWh
$24
-
kW-mo/yr
-
02 2.6212: Turn off equipment during breaks, reduce operating time $1,280 $4,000 $1,280
23,706
kWh
- -
03 2.4226: Use / purchase optimum sized compressor $3,847 $12,000 $2,998
55,515
kWh
$849
-
kW-mo/yr
-
04 2.7232: Replace existing hvac unit with high efficiency model $2,323 $12,000 $1,726
31,980
kWh
$597
-
kW-mo/yr
-
05 2.4322: Use or replace with energy efficient substitutes $61,283 $360,000 $7,076
131,030
kWh
$873
-
kW-mo/yr
$53,334
TOTAL RECOMMENDED $68,938 $388,500 $13,261
245,581
kWh
$2,343
-
kW-mo/yr
$53,334
TOTAL IMPLEMENTED $67,658 $384,500 $11,981
221,875
kWh
$2,343
-
kW-mo/yr
$53,334
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs