ITAC Assessment: LE0489
ITAC logo
ITAC Assessment: LE0489
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Steel Storage Tanks
NAICS 332420: Metal Tank (Heavy Gauge) Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 23
Plant Area 120,000
ft2
Annual Production 100
units
Production Hrs. Annual 4,212
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,855 2,084,050
kWh
Electricity Demand $22,380 7,967
kW-mo/yr
Electricity Fees $6,917 -
Natural Gas $72,503 7,252
MMBtu
Fuel Oil #1 $11,310 561
MMBtu
Fuel Oil #2 $9,094 546
MMBtu
TOTAL YEARLY COSTS $258,059
RECOMMENDED SAVINGS* $45,472 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,382

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7263: Lower compressor pressure through a/c system modification $3,081 $48 $2,744
42,218
kWh
$337
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,293 $12,000 $5,970
91,841
kWh
$1,323
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,609 $10,500 $5,106
78,554
kWh
$503
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,208 $8,000 $3,444
52,986
kWh
$764
-
kW-mo/yr
- -
05 2.2437: Recover waste heat from equipment $5,400 $12,000 - - $5,400
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $8,668 $21,820 $7,803
120,042
kWh
$865
-
kW-mo/yr
- -
07 2.1332: Convert combustion equipment to burn natural gas $9,314 $30,000 - - - $9,314
08 2.7232: Replace existing hvac unit with high efficiency model $1,899 $7,200 $1,697
26,112
kWh
$202
-
kW-mo/yr
- -
TOTAL RECOMMENDED $45,472 $101,568 $26,764
411,753
kWh
$3,994
-
kW-mo/yr
$5,400
-
MMBtu
$9,314
TOTAL IMPLEMENTED $23,382 $63,820 $7,803
120,042
kWh
$865
-
kW-mo/yr
$5,400
-
MMBtu
$9,314
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs