| Assessment Year | 2020 |
|---|---|
| Principal Product | Plastic Film |
| NAICS | 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing |
| SIC | 3081: Unsupported Plastics Film and Sheet |
| Sales Range | $50 M to 100M |
| # of Employees | 65 |
| Plant Area |
100,000
ft2
|
| Annual Production | 28,500,000
lb
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $545,180 | 7,555,533 |
kWh
|
$0.072 |
| Electricity Demand | $95,458 | 14,225 |
kW-mo/yr
|
$6.71 |
| Electricity Fees | $81,271 | - |
|
- |
| Natural Gas | $45,958 | 5,537 |
MMBtu
|
$8.30 |
| TOTAL YEARLY COSTS | $767,867 | |||
| RECOMMENDED SAVINGS* | $99,261 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $98,044 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7263: Lower compressor pressure through a/c system modification | $1,217 | $40 |
$1,076
14,942
kWh
|
$141
-
kW-mo/yr
|
- | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,201 | $360 |
$1,026
14,256
kWh
|
$175
-
kW-mo/yr
|
- | |
| 03 | 2.3311: Replace dc equipment with ac equipment | $82,690 | $150,334 |
$74,980
1,041,390
kWh
|
$7,710
-
kW-mo/yr
|
- | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,465 | $13,000 |
$4,754
66,021
kWh
|
$711
-
kW-mo/yr
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,995 | $12,420 |
$4,384
60,890
kWh
|
$611
-
kW-mo/yr
|
- | |
| 06 | 2.7232: Replace existing hvac unit with high efficiency model | $788 | $2,200 |
$627
8,704
kWh
|
$161
-
kW-mo/yr
|
- | |
| 07 | 2.7233: Use properly designed and sized hvac equipment | $2,905 | $9,300 | - | - |
$2,905
-
MMBtu
|
|
| TOTAL RECOMMENDED | $99,261 | $187,654 |
$86,847
1,206,203
kWh
|
$9,509
-
kW-mo/yr
|
$2,905
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $98,044 | $187,614 |
$85,771
1,191,261
kWh
|
$9,368
-
kW-mo/yr
|
$2,905
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs