ITAC Assessment: LE0485
ITAC logo
ITAC Assessment: LE0485
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Calcium Carbonate
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 42
Plant Area 1,500,000
ft2
Annual Production 120,000
ton
Production Hrs. Annual 8,400
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,522,673 25,480,148
kWh
Electricity Demand $140,767 50,095
kW-mo/yr
Electricity Fees $478,235 -
Natural Gas $588,000 113,818
MMBtu
TOTAL YEARLY COSTS $2,729,675
RECOMMENDED SAVINGS* $241,036 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $6,517 $120 $6,517
108,617
kWh
- - -
02 2.4322: Use or replace with energy efficient substitutes $22,930 $7,500 $21,514
358,570
kWh
$1,416
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,180 $2,250 $4,855
80,920
kWh
$325
-
kW-mo/yr
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $9,784 $9,200 $9,784
163,061
kWh
- - -
05 2.1224: Replace boiler $162,332 $344,000 - - $42,332
-
MMBtu
$120,000
06 2.4226: Use / purchase optimum sized compressor $28,883 $60,000 $27,416
456,925
kWh
$1,467
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $5,410 $17,950 $5,070
84,504
kWh
$340
-
kW-mo/yr
- -
TOTAL RECOMMENDED $241,036 $441,020 $75,156
1,252,597
kWh
$3,548
-
kW-mo/yr
$42,332
-
MMBtu
$120,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs