ITAC Assessment: LE0478
ITAC logo
ITAC Assessment: LE0478
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Narrow Width Textile
NAICS 313220: Narrow Fabric Mills and Schiffli Machine Embroidery
SIC 2241: Narrow Fabric and Other Smallware Mills: Cotton, Wool, Silk, and Manmade Fiber
Sales Range $10
M
to 50
M
# of Employees 23
Plant Area 150,000
ft2
Annual Production 500,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $223,090 3,925,238
kWh
Electricity Demand $28,338 9,506
kW-mo/yr
Electricity Fees $22,518 -
Natural Gas $190,603 36,863
MMBtu
TOTAL YEARLY COSTS $464,549
RECOMMENDED SAVINGS* $57,844 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $2,876 - $632
11,088
kWh
- $2,244
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $667 $60 $622
10,196
kWh
$45
-
kW-mo/yr
-
03 2.2113: Repair or replace steam traps $11,891 $9,000 - - $11,891
-
MMBtu
04 2.2442: Preheat combustion air with waste heat $39,339 $85,000 - - $39,339
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $187 $450 $187
3,286
kWh
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,884 $9,000 $2,622
46,002
kWh
$262
-
kW-mo/yr
-
TOTAL RECOMMENDED $57,844 $103,510 $4,063
70,572
kWh
$307
-
kW-mo/yr
$53,474
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs