Assessment Year | 2019 |
---|---|
Principal Product | Narrow Width Textile |
NAICS | 313220: Narrow Fabric Mills and Schiffli Machine Embroidery |
SIC | 2241: Narrow Fabric and Other Smallware Mills: Cotton, Wool, Silk, and Manmade Fiber |
Sales Range | $10 M to 50M |
# of Employees | 23 |
Plant Area |
150,000
ft2
|
Annual Production | 500,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $223,090 | 3,925,238 |
kWh
|
$0.057 |
Electricity Demand | $28,338 | 9,506 |
kW-mo/yr
|
$2.98 |
Electricity Fees | $22,518 | - |
|
- |
Natural Gas | $190,603 | 36,863 |
MMBtu
|
$5.17 |
TOTAL YEARLY COSTS | $464,549 | |||
RECOMMENDED SAVINGS* | $57,844 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $2,876 | - |
$632
11,088
kWh
|
- |
$2,244
-
MMBtu
|
|
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $667 | $60 |
$622
10,196
kWh
|
$45
-
kW-mo/yr
|
- | |
03 | 2.2113: Repair or replace steam traps | $11,891 | $9,000 | - | - |
$11,891
-
MMBtu
|
|
04 | 2.2442: Preheat combustion air with waste heat | $39,339 | $85,000 | - | - |
$39,339
-
MMBtu
|
|
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $187 | $450 |
$187
3,286
kWh
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,884 | $9,000 |
$2,622
46,002
kWh
|
$262
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $57,844 | $103,510 |
$4,063
70,572
kWh
|
$307
-
kW-mo/yr
|
$53,474
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs