ITAC Assessment: LE0476
ITAC logo
ITAC Assessment: LE0476
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Canned food products
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $100
M
to 500
M
# of Employees 55
Plant Area 522,720
ft2
Annual Production 14,500,000
units
Production Hrs. Annual 5,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $489,992 7,615,200
kWh
Electricity Demand $41,346 16,234
kW-mo/yr
Electricity Fees $12,132 -
Natural Gas $1,103,800 313,122
MMBtu
TOTAL YEARLY COSTS $1,647,270
RECOMMENDED SAVINGS* $639,375 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $159,828

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.6122: Adjust vents to minimize energy use $43,794 - $(-5,729.0)
(-89,520)
kWh
$(-477.0)
-
kW-mo/yr
- $50,000
02 2.2113: Repair or replace steam traps $19,944 $1,143 - - $19,944
-
MMBtu
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $96,090 $12,000 $95,899
1,498,425
kWh
$191
-
kW-mo/yr
- -
04 2.2511: Insulate bare equipment $2,802 $750 $2,802
43,788
kWh
- - -
05 2.2442: Preheat combustion air with waste heat $401,509 $120,000 - - $401,509
-
MMBtu
-
06 2.5125: Size air handling grills/ duct/s coils to minimize air resistance $14,597 $17,000 $13,513
211,144
kWh
$1,084
-
kW-mo/yr
- -
07 2.1233: Analyze flue gas for proper air/fuel ratio $48,028 $55,800 - - $48,028
-
MMBtu
-
08 2.7261: Install timers and/or thermostats $12,611 $28,000 $10,344
161,629
kWh
$2,267
-
kW-mo/yr
- -
TOTAL RECOMMENDED $639,375 $234,693 $116,829
1,825,466
kWh
$3,065
-
kW-mo/yr
$469,481
-
MMBtu
$50,000
TOTAL IMPLEMENTED $159,828 $13,143 $90,170
1,408,905
kWh
$(-286.0)
-
kW-mo/yr
$19,944
-
MMBtu
$50,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings