ITAC Assessment: LE0474
ITAC logo
ITAC Assessment: LE0474
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Bread
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $100
M
to 500
M
# of Employees 78
Plant Area 395,000
ft2
Annual Production 65,000,000
units
Production Hrs. Annual 8,736
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,761,173 23,700,301
kWh
Electricity Demand $483,912 51,228
kW-mo/yr
Electricity Fees $580,705 -
Natural Gas $709,545 102,830
MMBtu
TOTAL YEARLY COSTS $3,535,335
RECOMMENDED SAVINGS* $350,549 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $6,222 - $1,123
15,178
kWh
- $5,099
-
MMBtu
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $30,754 $20,000 $25,736
347,781
kWh
$5,018
-
kW-mo/yr
- -
03 2.2614: Use cooling tower or economizer to replace chiller cooling $28,595 $35,000 $23,747
320,904
kWh
$4,848
-
kW-mo/yr
- -
04 2.4322: Use or replace with energy efficient substitutes $17,687 $22,000 $15,050
203,374
kWh
$2,637
-
kW-mo/yr
- -
05 2.2442: Preheat combustion air with waste heat $73,547 $220,000 - - $73,547
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,789 $6,400 $1,222
16,511
kWh
$567
-
kW-mo/yr
- -
07 2.7232: Replace existing hvac unit with high efficiency model $150,418 $721,000 $117,456
1,587,239
kWh
$32,962
-
kW-mo/yr
- -
08 2.9114: Use solar heat to make electricty $41,537 $280,000 $10,211
137,986
kWh
- - $31,326
TOTAL RECOMMENDED $350,549 $1,304,400 $194,545
2,628,973
kWh
$46,032
-
kW-mo/yr
$78,646
-
MMBtu
$31,326
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs