| Assessment Year | 2019 |
|---|---|
| Principal Product | Paving stones |
| NAICS | 327331: Concrete Block and Brick Manufacturing |
| SIC | 3272: Concrete Products, Except Block and Brick |
| Sales Range | $1 M to 5M |
| # of Employees | 51 |
| Plant Area |
95,000
ft2
|
| Annual Production | 150,000
ton
|
| Production Hrs. Annual | 7,560
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $589,683 | 5,947,826 |
kWh
|
$0.099 |
| Electricity Demand | $51,915 | 12,698 |
kW-mo/yr
|
$4.09 |
| Electricity Fees | $152,021 | - |
|
- |
| Natural Gas | $68,527 | 8,379 |
MMBtu
|
$8.18 |
| TOTAL YEARLY COSTS | $862,146 | |||
| RECOMMENDED SAVINGS* | $53,117 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $44,205 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,354 | $563 |
$3,336
33,700
kWh
|
$3,018
-
kW-mo/yr
|
|
| 02 | 2.6218: Turn off equipment when not in use | $7,038 | $1,500 |
$7,038
71,089
kWh
|
- | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $3,747 | $2,000 |
$3,547
35,828
kWh
|
$200
-
kW-mo/yr
|
|
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $208 | $285 |
$194
1,995
kWh
|
$14
-
kW-mo/yr
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $33,212 | $57,800 |
$31,429
317,466
kWh
|
$1,783
-
kW-mo/yr
|
|
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,558 | $6,000 |
$2,419
24,439
kWh
|
$139
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $53,117 | $68,148 |
$47,963
484,517
kWh
|
$5,154
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $44,205 | $61,585 |
$42,208
426,378
kWh
|
$1,997
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs