| Assessment Year | 2018 |
|---|---|
| Principal Product | Thermoformed Plastic Trays |
| NAICS | 326112: Plastics Packaging Film and Sheet (including Laminated) Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 109 |
| Plant Area |
62,500
ft2
|
| Annual Production | 265,000,000
units
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $414,294 | 8,577,509 |
kWh
|
$0.048 |
| Electricity Demand | $64,137 | 21,595 |
kW-mo/yr
|
$2.97 |
| Electricity Fees | $111,089 | - |
|
- |
| Natural Gas | $18,997 | 1,965 |
MMBtu
|
$9.67 |
| TOTAL YEARLY COSTS | $608,517 | |||
| RECOMMENDED SAVINGS* | $84,413 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,918 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,416 | $1,000 |
$4,840
100,826
kWh
|
$576
-
kW-mo/yr
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,502 | $19,292 |
$5,811
121,056
kWh
|
$691
-
kW-mo/yr
|
|
| 03 | 2.7232: Replace existing hvac unit with high efficiency model | $15,594 | $73,000 |
$13,991
291,470
kWh
|
$1,603
-
kW-mo/yr
|
|
| 04 | 2.2622: Replace existing chiller with high efficiency model | $47,928 | $260,000 |
$42,831
892,320
kWh
|
$5,097
-
kW-mo/yr
|
|
| 05 | 2.4226: Use / purchase optimum sized compressor | $8,973 | $50,000 |
$8,020
167,080
kWh
|
$953
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $84,413 | $403,292 |
$75,493
1,572,752
kWh
|
$8,920
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $11,918 | $20,292 |
$10,651
221,882
kWh
|
$1,267
-
kW-mo/yr
|
||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs