ITAC Assessment: LE0460
ITAC logo
ITAC Assessment: LE0460
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Miscellaneous Metal
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 110,000
ft2
Annual Production 100,000
ton
Production Hrs. Annual 2,080
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,920 815,040
kWh
Electricity Demand $14,827 3,723
kW-mo/yr
Electricity Fees $9,023 -
Natural Gas $36,678 4,898
MMBtu
TOTAL YEARLY COSTS $115,448
RECOMMENDED SAVINGS* $17,108 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $650 $40 $531
7,916
kWh
$120
-
kW-mo/yr
- -
02 2.4221: Install compressor air intakes in coolest locations $508 $1,000 $412
6,142
kWh
$96
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,239 $14,500 $4,264
63,648
kWh
$975
-
kW-mo/yr
- -
04 2.1224: Replace boiler $6,378 $28,000 - - $1,378
-
MMBtu
$5,000
05 2.7232: Replace existing hvac unit with high efficiency model $4,333 $19,000 $3,473
51,840
kWh
$860
-
kW-mo/yr
- -
TOTAL RECOMMENDED $17,108 $62,540 $8,680
129,546
kWh
$2,050
-
kW-mo/yr
$1,378
-
MMBtu
$5,000
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs