Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Process control equipment
NAICS 339999: All Other Miscellaneous Manufacturing
SIC 2823: Cellulosic Manmade Fibers
Sales Range $100
M
to 500
M
# of Employees 150
Plant Area 81,000
ft2
Annual Production 50,000,000
units
Production Hrs. Annual 2,080
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,692 719,717
kWh
Electricity Demand $20,164 3,454
kW-mo/yr
Electricity Fees $27,940 -
Natural Gas $14,590 3,767
MMBtu
TOTAL YEARLY COSTS $115,386
RECOMMENDED SAVINGS* $9,910 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,568

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,864 $13,360 $2,643
36,209
kWh
$1,221
-
kW-mo/yr
-
02 2.4226: Use / purchase optimum sized compressor $2,140 $9,000 $1,840
25,200
kWh
$672
-
kW-mo/yr
$(-372.0)
-
MMBtu
03 2.4226: Use / purchase optimum sized compressor $2,162 $10,000 $1,479
20,266
kWh
$683
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $180 $900 $110
1,505
kWh
$70
-
kW-mo/yr
-
05 2.7232: Replace existing hvac unit with high efficiency model $1,564 $8,400 $1,043
14,288
kWh
$521
-
kW-mo/yr
-
TOTAL RECOMMENDED $9,910 $41,660 $7,115
97,468
kWh
$3,167
-
kW-mo/yr
$(-372.0)
-
MMBtu
TOTAL IMPLEMENTED $7,568 $30,760 $5,526
75,697
kWh
$2,414
-
kW-mo/yr
$(-372.0)
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs