Assessment Year | 2017 |
---|---|
Principal Product | Cast Products |
NAICS | 331513: Steel Foundries (except Investment) |
SIC | 3325: Steel Foundries, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 32 |
Plant Area |
60,000
ft2
|
Annual Production | 246
ton
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $145,349 | 2,543,552 |
kWh
|
$0.057 |
Electricity Demand | $38,001 | 12,060 |
kW-mo/yr
|
$3.15 |
Electricity Fees | $21,963 | - |
|
- |
Natural Gas | $79,243 | 7,190 |
MMBtu
|
$11.02 |
TOTAL YEARLY COSTS | $284,556 | |||
RECOMMENDED SAVINGS* | $21,440 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,637 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,483 | $55 |
$2,215
38,864
kWh
|
$268
-
kW-mo/yr
|
- | |
02 | 2.7261: Install timers and/or thermostats | $764 | $55 |
$169
2,966
kWh
|
- |
$595
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,280 | $1,000 |
$3,006
52,744
kWh
|
$274
-
kW-mo/yr
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $402 | $300 |
$311
5,450
kWh
|
$91
-
kW-mo/yr
|
- | |
05 | 2.7232: Replace existing hvac unit with high efficiency model | $3,320 | $8,550 |
$3,043
53,387
kWh
|
$277
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,407 | $15,961 |
$3,909
68,578
kWh
|
$498
-
kW-mo/yr
|
- | |
07 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $2,616 | $10,500 |
$(-156.0)
(-2,746)
kWh
|
$(-126.0)
-
kW-mo/yr
|
$2,898
-
MMBtu
|
|
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,523 | $18,585 |
$2,672
46,883
kWh
|
$851
-
kW-mo/yr
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $645 | $3,413 |
$560
9,828
kWh
|
$85
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $21,440 | $58,419 |
$15,729
275,954
kWh
|
$2,218
-
kW-mo/yr
|
$3,493
-
MMBtu
|
||
TOTAL IMPLEMENTED | $15,637 | $49,814 |
$10,471
183,703
kWh
|
$1,673
-
kW-mo/yr
|
$3,493
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs