ITAC Assessment: HO0072
ITAC logo
ITAC Assessment: HO0072
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Pollution Control Equipment
NAICS
n/a
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 47
Plant Area 15,000
ft2
Annual Production 400
pieces
Production Hrs. Annual 2,080
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,433 195,193
kWh
Natural Gas $34,050 11,627
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,029 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $467

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,201 $1,302 $1,201
8,792
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $187 $419 $187
1,465
kWh
-
03 2.4133: Use most efficient type of electric motors $100 $225 $100
879
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $842 $400 $842
6,155
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $232 $800 $232
1,758
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $467 $472 - $467
-
MMBtu
TOTAL RECOMMENDED $3,029 $3,618 $2,562
19,049
kWh
$467
-
MMBtu
TOTAL IMPLEMENTED $467 $472 - $467
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs