ITAC Assessment: LE0456
ITAC logo
ITAC Assessment: LE0456
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Precision Metal Forming
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3466: Crowns and Closures
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 45,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,873 1,332,238
kWh
Electricity Demand $21,394 4,806
kW-mo/yr
Electricity Fees $11,601 -
Natural Gas $46,589 5,213
MMBtu
TOTAL YEARLY COSTS $168,457
RECOMMENDED SAVINGS* $32,072 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,753

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $7,810 $36 - - $7,810
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,319 $2,000 $1,230
18,352
kWh
$89
-
kW-mo/yr
-
03 2.2614: Use cooling tower or economizer to replace chiller cooling $2,140 $3,500 $1,766
26,360
kWh
$374
-
kW-mo/yr
-
04 2.4322: Use or replace with energy efficient substitutes $14,979 $50,000 $13,960
208,358
kWh
$1,019
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $783 $3,200 $663
9,901
kWh
$120
-
kW-mo/yr
-
06 2.4226: Use / purchase optimum sized compressor $5,041 $40,000 $4,614
68,866
kWh
$427
-
kW-mo/yr
-
TOTAL RECOMMENDED $32,072 $98,736 $22,233
331,837
kWh
$2,029
-
kW-mo/yr
$7,810
TOTAL IMPLEMENTED $30,753 $96,736 $21,003
313,485
kWh
$1,940
-
kW-mo/yr
$7,810
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs