Assessment Year | 2018 |
---|---|
Principal Product | Juice and tea |
NAICS | 312111: Soft Drink Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $10 M to 50M |
# of Employees | 119 |
Plant Area |
353,705
ft2
|
Annual Production | 20,000,000
units
|
Production Hrs. Annual | 5,400
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $540,279 | 10,258,159 |
kWh
|
$0.053 |
Electricity Demand | $60,002 | 25,027 |
kW-mo/yr
|
$2.40 |
Electricity Fees | $52,432 | - |
|
- |
Natural Gas | $659,269 | 133,547 |
MMBtu
|
$4.94 |
TOTAL YEARLY COSTS | $1,311,982 | |||
RECOMMENDED SAVINGS* | $240,094 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,430 | $1,000 |
$6,751
127,375
kWh
|
$679
-
kW-mo/yr
|
- | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,260 | $600 |
$2,166
40,873
kWh
|
$94
-
kW-mo/yr
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,616 | $17,500 |
$6,764
127,620
kWh
|
$852
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,984 | $45,750 |
$15,835
298,771
kWh
|
$1,150
-
kW-mo/yr
|
- | - | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $40,671 | $115,000 | - | - |
$40,671
-
MMBtu
|
- | |
06 | 2.4226: Use / purchase optimum sized compressor | $155,577 | $500,000 |
$5,577
105,222
kWh
|
- | - | $150,000 | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,026 | $9,190 |
$2,026
38,220
kWh
|
- | - | - | |
08 | 2.7232: Replace existing hvac unit with high efficiency model | $6,475 | $30,000 |
$6,096
115,024
kWh
|
$379
-
kW-mo/yr
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,055 | $5,250 |
$935
17,640
kWh
|
$120
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $240,094 | $724,290 |
$46,150
870,745
kWh
|
$3,274
-
kW-mo/yr
|
$40,671
-
MMBtu
|
$150,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs