Assessment Year | 2018 |
---|---|
Principal Product | Airplane parts |
NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
200,000
ft2
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 3,744
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $217,625 | 2,339,188 |
kWh
|
$0.093 |
Natural Gas | $106,207 | 10,306 |
MMBtu
|
$10.31 |
TOTAL YEARLY COSTS | $323,832 | |||
RECOMMENDED SAVINGS* | $71,436 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,299 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,296 | $40 |
$2,296
24,688
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $13,551 | $1,000 |
$13,551
145,710
kWh
|
- | |
03 | 2.4239: Eliminate or reduce compressed air usage | $7,386 | $7,000 |
$7,386
79,422
kWh
|
- | |
04 | 2.2437: Recover waste heat from equipment | $4,124 | $4,000 | - |
$4,124
-
MMBtu
|
|
05 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $6,686 | $9,000 |
$(-325.0)
(-3,490)
kWh
|
$7,011
-
MMBtu
|
|
06 | 2.7313: Recycle air for heating, ventilation and air conditioning | $18,094 | $32,500 | - |
$18,094
-
MMBtu
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,710 | $21,525 |
$5,710
61,402
kWh
|
- | |
08 | 2.4226: Use / purchase optimum sized compressor | $13,589 | $53,000 |
$13,589
146,114
kWh
|
- | |
TOTAL RECOMMENDED | $71,436 | $128,065 |
$42,207
453,846
kWh
|
$29,229
-
MMBtu
|
||
TOTAL IMPLEMENTED | $19,299 | $74,525 |
$19,299
207,516
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs