ITAC Assessment: LE0445
ITAC logo
ITAC Assessment: LE0445
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Metallic components, Power coating
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 92
Plant Area 42,150
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 2,470
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,753 1,649,104
kWh
Electricity Demand $16,729 6,568
kW-mo/yr
Electricity Fees $10,331 -
Natural Gas $113,882 20,575
MMBtu
TOTAL YEARLY COSTS $244,695
RECOMMENDED SAVINGS* $22,126 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,963

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,107 $1,000 $5,785
91,827
kWh
$322
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,590 $1,500 $765
12,140
kWh
$3,825
-
kW-mo/yr
-
03 2.2441: Preheat boiler makeup water with waste process heat $9,163 $3,000 - - $9,163
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $525 $750 $494
7,845
kWh
$31
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,741 $6,692 $1,455
23,094
kWh
$286
-
kW-mo/yr
-
TOTAL RECOMMENDED $22,126 $12,942 $8,499
134,906
kWh
$4,464
-
kW-mo/yr
$9,163
-
MMBtu
TOTAL IMPLEMENTED $12,963 $9,942 $8,499
134,906
kWh
$4,464
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs