ITAC Assessment: TN0412
ITAC logo
ITAC Assessment: TN0412
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product PRINTED WIRING BOARDS
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 900
Plant Area
n/a
Annual Production 500
thousand feet
Production Hrs. Annual 7,200
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,517,000 34,415,886
kWh
Natural Gas $314,700 103,524
MMBtu
Fuel Oil #2 $42,000 9,800
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,659 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $55,976

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.2163: Use minimum steam operating pressure $46,500 - - $37,137
-
MMBtu
$9,363
-
MMBtu
02 2.2425: Use flue gases to heat process or service water $11,598 $10,600 - $9,318
-
MMBtu
$2,280
-
MMBtu
03 2.6212: Turn off equipment during breaks, reduce operating time $7,159 - - $5,718
-
MMBtu
$1,441
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $2,317 $1,500 - $1,863
-
MMBtu
$454
-
MMBtu
05 2.4239: Eliminate or reduce compressed air usage $8,740 $2,460 $8,740
198,710
kWh
- -
06 2.4312: Improve lubrication practices $4,345 - $4,345
98,769
kWh
- -
TOTAL RECOMMENDED $80,659 $14,560 $13,085
297,479
kWh
$54,036
-
MMBtu
$13,538
-
MMBtu
TOTAL IMPLEMENTED $55,976 $1,500 - $44,718
-
MMBtu
$11,258
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs