ITAC Assessment: LE0443
ITAC logo
ITAC Assessment: LE0443
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Pharmaceuticals
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $1
M
to 5
M
# of Employees 616
Plant Area 200,000
ft2
Annual Production 175,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,526,414 28,567,224
kWh
Electricity Demand $120,844 55,121
kW-mo/yr
Electricity Fees $79,380 -
Natural Gas $569,894 147,778
MMBtu
TOTAL YEARLY COSTS $2,296,532
RECOMMENDED SAVINGS* $574,772 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $139,316

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,762 $1,000 $7,191
135,677
kWh
$571
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,930 $8,000 $10,127
191,070
kWh
$803
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,156 $8,000 $8,482
160,036
kWh
$674
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,373 $5,300 $4,051
76,428
kWh
$322
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $61,512 $97,637 $56,983
1,075,152
kWh
$4,529
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $46,572 $108,715 $43,145
814,058
kWh
$3,427
-
kW-mo/yr
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,458 $8,500 $3,213
60,613
kWh
$245
-
kW-mo/yr
- -
08 2.4221: Install compressor air intakes in coolest locations $2,903 $9,500 $2,640
49,807
kWh
$263
-
kW-mo/yr
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $10,710 $37,500 $9,922
187,200
kWh
$788
-
kW-mo/yr
- -
10 2.7232: Replace existing hvac unit with high efficiency model $385,040 $1,360,000 $230,708
4,352,980
kWh
$18,332
-
kW-mo/yr
- $136,000
11 2.2441: Preheat boiler makeup water with waste process heat $8,886 $32,000 - - $8,886
-
MMBtu
-
12 2.4226: Use / purchase optimum sized compressor $14,690 $63,000 $12,255
231,230
kWh
$2,435
-
kW-mo/yr
- -
13 2.7142: Utilize higher efficiency lamps and/or ballasts $2,256 $10,938 $2,026
38,220
kWh
$230
-
kW-mo/yr
- -
14 2.4226: Use / purchase optimum sized compressor $6,524 $32,000 $5,442
102,685
kWh
$1,082
-
kW-mo/yr
- -
TOTAL RECOMMENDED $574,772 $1,782,090 $396,185
7,475,156
kWh
$33,701
-
kW-mo/yr
$8,886
-
MMBtu
$136,000
TOTAL IMPLEMENTED $139,316 $313,290 $127,042
2,397,022
kWh
$12,274
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs