ITAC Assessment: MA0585
ITAC logo
ITAC Assessment: MA0585
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product specialty paper
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area 50,000
ft2
Annual Production 25,000
ton
Production Hrs. Annual 8,590
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,327,542 4,303,200
kWh
Electricity Demand $210,605 81,390
kW-mo/yr
Electricity Fees $157,628 -
Fuel Oil #6 $1,032,051 240,010
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $408,334 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $204,010

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings
01 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $112,569 $254,000 $106,327
1,389,900
kWh
$6,242
-
kW-mo/yr
-
02 2.2449: Recover heat from exhausted steam, hot air or hot water $91,755 $254,400 - - $91,755
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $73,100 $37,300 $68,920
900,900
kWh
$4,180
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $54,416 $37,300 $51,309
670,700
kWh
$3,107
-
kW-mo/yr
-
05 2.2163: Use minimum steam operating pressure $29,239 $23,014 - - $29,239
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $28,480 $78,770 $26,430
345,500
kWh
$2,050
-
kW-mo/yr
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,353 $9,225 $6,933
90,600
kWh
$420
-
kW-mo/yr
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,385 $5,300 $6,020
78,700
kWh
$365
-
kW-mo/yr
-
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,037 $5,300 $4,751
62,100
kWh
$286
-
kW-mo/yr
-
TOTAL RECOMMENDED $408,334 $704,609 $270,690
3,538,400
kWh
$16,650
-
kW-mo/yr
$120,994
-
MMBtu
TOTAL IMPLEMENTED $204,010 $196,209 $164,363
2,148,500
kWh
$10,408
-
kW-mo/yr
$29,239
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings