ITAC Assessment: MI0248
ITAC logo
ITAC Assessment: MI0248
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Furniture
NAICS 321918: Other Millwork (including Flooring)
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 103
Plant Area 60,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,369 973,626
kWh
Electricity Demand $45,908 4,477
kW-mo/yr
Electricity Fees $18,824 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,400 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,858

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,983 $30,489 $5,133
100,600
kWh
$2,850
-
kW-mo/yr
-
02 2.6218: Turn off equipment when not in use $7,449 $2,300 $3,774
75,482
kWh
$3,675
-
kW-mo/yr
-
03 2.7111: Reduce illumination to minimum necessary levels $6,335 $440 $4,070
81,390
kWh
$2,265
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,637 $9,460 $3,620
72,407
kWh
$2,017
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,241 $1,660 $399
7,999
kWh
$842
-
kW-mo/yr
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,180 $80 $684
13,684
kWh
$496
-
kW-mo/yr
-
07 4.821: Pay bills on time to avoid late fees $1,005 $240 - - $1,005
08 2.4239: Eliminate or reduce compressed air usage $965 $2,200 $606
12,127
kWh
$359
-
kW-mo/yr
-
09 2.7135: Install occupancy sensors $605 $209 $390
7,806
kWh
$215
-
kW-mo/yr
-
TOTAL RECOMMENDED $32,400 $47,078 $18,676
371,495
kWh
$12,719
-
kW-mo/yr
$1,005
TOTAL IMPLEMENTED $18,858 $34,769 $9,990
197,765
kWh
$7,863
-
kW-mo/yr
$1,005
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings