Assessment Year | 2013 |
---|---|
Principal Product | Furniture |
NAICS | 321918: Other Millwork (including Flooring) |
SIC | 2431: Millwork |
Sales Range | $10 M to 50M |
# of Employees | 103 |
Plant Area |
60,000
ft2
|
Annual Production | 50,000
pieces
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $50,369 | 973,626 |
kWh
|
$0.052 |
Electricity Demand | $45,908 | 4,477 |
kW-mo/yr
|
$10.25 |
Electricity Fees | $18,824 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,400 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,858 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,983 | $30,489 |
$5,133
100,600
kWh
|
$2,850
-
kW-mo/yr
|
- | |
02 | 2.6218: Turn off equipment when not in use | $7,449 | $2,300 |
$3,774
75,482
kWh
|
$3,675
-
kW-mo/yr
|
- | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $6,335 | $440 |
$4,070
81,390
kWh
|
$2,265
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,637 | $9,460 |
$3,620
72,407
kWh
|
$2,017
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,241 | $1,660 |
$399
7,999
kWh
|
$842
-
kW-mo/yr
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,180 | $80 |
$684
13,684
kWh
|
$496
-
kW-mo/yr
|
- | |
07 | 4.821: Pay bills on time to avoid late fees | $1,005 | $240 | - | - | $1,005 | |
08 | 2.4239: Eliminate or reduce compressed air usage | $965 | $2,200 |
$606
12,127
kWh
|
$359
-
kW-mo/yr
|
- | |
09 | 2.7135: Install occupancy sensors | $605 | $209 |
$390
7,806
kWh
|
$215
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $32,400 | $47,078 |
$18,676
371,495
kWh
|
$12,719
-
kW-mo/yr
|
$1,005 | ||
TOTAL IMPLEMENTED | $18,858 | $34,769 |
$9,990
197,765
kWh
|
$7,863
-
kW-mo/yr
|
$1,005 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs