ITAC Assessment: LE0442
ITAC logo
ITAC Assessment: LE0442
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Printed Materials
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2754: Commercial Printing, Gravure
Sales Range $500
k
to 1
M
# of Employees 31
Plant Area 86,000
ft2
Annual Production 164,000
thousand feet
Production Hrs. Annual 4,160
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $253,160 4,132,349
kWh
Electricity Demand $42,132 10,739
kW-mo/yr
Electricity Fees $47,590 -
Natural Gas $116,780 32,107
MMBtu
TOTAL YEARLY COSTS $459,662
RECOMMENDED SAVINGS* $25,700 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,149

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,716 $1,000 $6,751
110,702
kWh
$965
-
kW-mo/yr
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $8,680 $5,000 - - $8,680
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $1,763 $2,250 $1,481
24,281
kWh
$282
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,887 $7,663 $3,279
53,747
kWh
$608
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,108 $5,000 $1,845
30,258
kWh
$263
-
kW-mo/yr
-
06 2.4133: Use most efficient type of electric motors $1,186 $5,500 $1,002
16,430
kWh
$184
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $360 $1,800 $305
4,992
kWh
$55
-
kW-mo/yr
-
TOTAL RECOMMENDED $25,700 $28,213 $14,663
240,410
kWh
$2,357
-
kW-mo/yr
$8,680
-
MMBtu
TOTAL IMPLEMENTED $13,149 $15,963 $11,337
185,871
kWh
$1,812
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs