ITAC Assessment: LE0439
ITAC logo
ITAC Assessment: LE0439
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Tank Ammunition and Milled Products
NAICS 332993: Ammunition (except Small Arms) Manufacturing
SIC 3483: Ammunition, Except for Small Arms
Sales Range $10
M
to 50
M
# of Employees 68
Plant Area 283,349
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 7,140
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $506,779 9,515,855
kWh
Electricity Demand $62,266 30,522
kW-mo/yr
Electricity Fees $111,038 -
Natural Gas $208,440 38,501
MMBtu
Waste Disposal Costs
Water Usage $93,850 13,400
Tgal
TOTAL YEARLY COSTS $982,373
RECOMMENDED SAVINGS* $104,131 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,372

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,940 $750 $4,775
90,089
kWh
$165
-
kW-mo/yr
- -
02 2.4221: Install compressor air intakes in coolest locations $2,477 $600 $2,367
44,665
kWh
$110
-
kW-mo/yr
- -
03 2.7231: Use radiant heater for spot heating $17,188 $9,084 - - $17,188
-
MMBtu
-
04 3.4113: Treat and reuse rinse waters $35,049 $30,000 - - - $35,049
-
Tgal
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,559 $4,244 $3,218
60,715
kWh
$341
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,992 $5,000 $2,878
54,309
kWh
$114
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $6,903 $21,654 $6,036
113,891
kWh
$867
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $31,023 $105,761 $29,138
549,780
kWh
$1,885
-
kW-mo/yr
- -
TOTAL RECOMMENDED $104,131 $177,093 $48,412
913,449
kWh
$3,482
-
kW-mo/yr
$17,188
-
MMBtu
$35,049
-
Tgal
TOTAL IMPLEMENTED $12,372 $27,254 $11,281
212,865
kWh
$1,091
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs