Assessment Year | 2017 |
---|---|
Principal Product | Vessel parts and mod systems |
NAICS | 336611: Ship Building and Repairing |
SIC | 3731: Ship Building and Repairing |
Sales Range | $1 M to 5M |
# of Employees | 23 |
Plant Area |
65,000
ft2
|
Annual Production | 50,000
units
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $839,313 | 8,371,368 |
kWh
|
$0.10 |
Electricity Fees | $44,174 | - |
|
- |
TOTAL YEARLY COSTS | $883,487 | |||
RECOMMENDED SAVINGS* | $238,808 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|
01 | 2.4323: Use optimum size and capacity equipment | $12,220 | $7,000 |
$12,220
122,195
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $26,208 | $20,000 |
$26,208
262,080
kWh
|
- | |
03 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $37,770 | $36,000 |
$(-12,230.0)
(-122,304)
kWh
|
$50,000 | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,482 | $14,000 |
$11,482
114,824
kWh
|
- | |
05 | 2.3522: Increase electrical conductor size to reduce distribution losses | $35,693 | $50,000 |
$35,693
356,926
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,862 | $12,000 |
$7,862
78,624
kWh
|
- | |
07 | 2.3513: Consider power loss as well as initial loads and load growth in down-sizing transformers | $86,210 | $200,000 |
$86,210
862,105
kWh
|
- | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $21,363 | $60,000 |
$21,363
213,632
kWh
|
- | |
TOTAL RECOMMENDED | $238,808 | $399,000 |
$188,808
1,888,082
kWh
|
$50,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs