ITAC Assessment: LE0437
ITAC logo
ITAC Assessment: LE0437
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Vessel parts and mod systems
NAICS 336611: Ship Building and Repairing
SIC 3731: Ship Building and Repairing
Sales Range $1
M
to 5
M
# of Employees 23
Plant Area 65,000
ft2
Annual Production 50,000
units
Production Hrs. Annual 3,120
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $839,313 8,371,368
kWh
Electricity Fees $44,174 -
TOTAL YEARLY COSTS $883,487
RECOMMENDED SAVINGS* $238,808 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4323: Use optimum size and capacity equipment $12,220 $7,000 $12,220
122,195
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $26,208 $20,000 $26,208
262,080
kWh
-
03 2.4222: Install adequate dryers on air lines to eliminate blowdown $37,770 $36,000 $(-12,230.0)
(-122,304)
kWh
$50,000
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,482 $14,000 $11,482
114,824
kWh
-
05 2.3522: Increase electrical conductor size to reduce distribution losses $35,693 $50,000 $35,693
356,926
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $7,862 $12,000 $7,862
78,624
kWh
-
07 2.3513: Consider power loss as well as initial loads and load growth in down-sizing transformers $86,210 $200,000 $86,210
862,105
kWh
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $21,363 $60,000 $21,363
213,632
kWh
-
TOTAL RECOMMENDED $238,808 $399,000 $188,808
1,888,082
kWh
$50,000
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs