Assessment Year | 2017 |
---|---|
Principal Product | Water Pollution Control Plant |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | less than $500 k |
# of Employees | 125 |
Plant Area |
4,200,000
ft2
|
Annual Production | 60,225,000
units
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $4,388,693 | 66,028,188 |
kWh
|
$0.066 |
Electricity Demand | $628,177 | 106,595 |
kW-mo/yr
|
$5.89 |
Electricity Fees | $262,150 | - |
|
- |
Other Gas | $1,324,239 | 238,817 |
MMBtu
|
$5.54 |
TOTAL YEARLY COSTS | $6,603,259 | |||
RECOMMENDED SAVINGS* | $481,808 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $151,787 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $33,075 | $24,000 | - | - |
$33,075
-
MMBtu
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $207,824 | $260,000 |
$185,130
2,805,002
kWh
|
$22,694
-
kW-mo/yr
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,101 | $1,500 |
$954
14,446
kWh
|
$147
-
kW-mo/yr
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $5,736 | $14,000 |
$5,224
79,144
kWh
|
$512
-
kW-mo/yr
|
- | |
05 | 2.4133: Use most efficient type of electric motors | $55,121 | $144,000 |
$49,101
743,958
kWh
|
$6,020
-
kW-mo/yr
|
- | |
06 | 2.4133: Use most efficient type of electric motors | $88,021 | $265,000 |
$78,408
1,188,005
kWh
|
$9,613
-
kW-mo/yr
|
- | |
07 | 2.7232: Replace existing hvac unit with high efficiency model | $78,911 | $270,000 |
$70,294
1,065,064
kWh
|
$8,617
-
kW-mo/yr
|
- | |
08 | 2.4133: Use most efficient type of electric motors | $12,019 | $59,000 |
$9,286
140,701
kWh
|
$2,733
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $481,808 | $1,037,500 |
$398,397
6,036,320
kWh
|
$50,336
-
kW-mo/yr
|
$33,075
-
MMBtu
|
||
TOTAL IMPLEMENTED | $151,787 | $487,000 |
$133,905
2,028,867
kWh
|
$17,882
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs