ITAC Assessment: LE0431
ITAC logo
ITAC Assessment: LE0431
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Plastic
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 10
Plant Area 30,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,583 1,440,640
kWh
Electricity Demand $15,442 3,470
kW-mo/yr
Electricity Fees $22,604 -
Fuel Oil #1 $7,002 528
MMBtu
TOTAL YEARLY COSTS $148,631
RECOMMENDED SAVINGS* $25,770 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,758

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,440 $1,000 $3,075
42,703
kWh
$365
-
kW-mo/yr
02 2.7135: Install occupancy sensors $3,727 $1,500 $3,727
51,757
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,291 $643 $1,153
16,018
kWh
$138
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,098 $4,125 $673
9,350
kWh
$2,425
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,000 $9,467 $5,350
74,309
kWh
$650
-
kW-mo/yr
06 2.7232: Replace existing hvac unit with high efficiency model $5,655 $10,500 $5,054
70,200
kWh
$601
-
kW-mo/yr
07 2.4221: Install compressor air intakes in coolest locations $509 $950 $434
6,019
kWh
$75
-
kW-mo/yr
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $750 $3,500 $670
9,310
kWh
$80
-
kW-mo/yr
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,300 $6,300 $1,011
14,040
kWh
$289
-
kW-mo/yr
TOTAL RECOMMENDED $25,770 $37,985 $21,147
293,706
kWh
$4,623
-
kW-mo/yr
TOTAL IMPLEMENTED $15,758 $18,910 $14,316
198,827
kWh
$1,442
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs