| Assessment Year | 2017 |
|---|---|
| Principal Product | Plastic |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 10 |
| Plant Area |
30,000
ft2
|
| Annual Production | 1,000,000
units
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $103,583 | 1,440,640 |
kWh
|
$0.072 |
| Electricity Demand | $15,442 | 3,470 |
kW-mo/yr
|
$4.45 |
| Electricity Fees | $22,604 | - |
|
- |
| Fuel Oil #1 | $7,002 | 528 |
MMBtu
|
$13.26 |
| TOTAL YEARLY COSTS | $148,631 | |||
| RECOMMENDED SAVINGS* | $25,770 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,758 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,440 | $1,000 |
$3,075
42,703
kWh
|
$365
-
kW-mo/yr
|
|
| 02 | 2.7135: Install occupancy sensors | $3,727 | $1,500 |
$3,727
51,757
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,291 | $643 |
$1,153
16,018
kWh
|
$138
-
kW-mo/yr
|
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,098 | $4,125 |
$673
9,350
kWh
|
$2,425
-
kW-mo/yr
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,000 | $9,467 |
$5,350
74,309
kWh
|
$650
-
kW-mo/yr
|
|
| 06 | 2.7232: Replace existing hvac unit with high efficiency model | $5,655 | $10,500 |
$5,054
70,200
kWh
|
$601
-
kW-mo/yr
|
|
| 07 | 2.4221: Install compressor air intakes in coolest locations | $509 | $950 |
$434
6,019
kWh
|
$75
-
kW-mo/yr
|
|
| 08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $750 | $3,500 |
$670
9,310
kWh
|
$80
-
kW-mo/yr
|
|
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,300 | $6,300 |
$1,011
14,040
kWh
|
$289
-
kW-mo/yr
|
|
| TOTAL RECOMMENDED | $25,770 | $37,985 |
$21,147
293,706
kWh
|
$4,623
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $15,758 | $18,910 |
$14,316
198,827
kWh
|
$1,442
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs