IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Bakery Products
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 99,200
ft2
Annual Production 56,851,006
lb
Production Hrs. Annual 6,240
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $273,859 6,365,661
kWh
Electricity Demand $222,518 11,927
kW-mo/yr
Electricity Fees $4,636 -
Natural Gas $240,878 44,800
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,340 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,050

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $13,680 $14,840 $7,510
173,700
kWh
$6,170
-
kW-mo/yr
-
02 2.4239: Eliminate or reduce compressed air usage $3,400 $1,180 $1,870
43,300
kWh
$1,530
-
kW-mo/yr
-
03 2.2626: Avoid frost formation on evaporators $3,080 $5,460 $3,080
71,200
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,860 $60 $1,570
36,400
kWh
$1,290
-
kW-mo/yr
-
05 2.4133: Use most efficient type of electric motors $1,290 $3,760 $810
18,700
kWh
$480
-
kW-mo/yr
-
06 2.7243: Improve air circulation with destratification fans / other methods $6,030 $12,680 $(-180.0)
(-4,200)
kWh
$(-110.0)
-
kW-mo/yr
$6,320
-
MMBtu
TOTAL RECOMMENDED $30,340 $37,980 $14,660
339,100
kWh
$9,360
-
kW-mo/yr
$6,320
-
MMBtu
TOTAL IMPLEMENTED $18,050 $24,060 $11,400
263,600
kWh
$6,650
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs