ITAC Assessment: NC0646
ITAC logo
ITAC Assessment: NC0646
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Wood chips and fuel for paper mills
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $5
M
to 10
M
# of Employees 8
Plant Area 3,300
ft2
Annual Production 260,000,000
lb
Production Hrs. Annual 2,625
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,943 420,480
kWh
Electricity Demand $13,509 3,453
kW-mo/yr
Electricity Fees $1,584 -
Fuel Oil #2 $55,485 3,515
MMBtu
Waste Disposal Costs
Water Usage $4,646 454
Tgal
Water Disposal $5,866 454
Tgal
TOTAL YEARLY COSTS $114,033
RECOMMENDED SAVINGS* $385,648 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $377,934

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #2 Savings Water Disposal Savings Increase in Production Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $377,240 $300,000 $(-18,620.0)
(-238,720)
kWh
$(-5,583.0)
-
kW-mo/yr
- $34,953
-
MMBtu
- $366,490
02 2.7142: Utilize higher efficiency lamps and/or ballasts $225 $778 $182
2,339
kWh
$43
-
kW-mo/yr
- - - -
03 2.7491: Insulate glazing, walls, ceilings, and roofs $188 $83 $188
2,408
kWh
- - - - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $694 $362 $1,638
21,000
kWh
$469
-
kW-mo/yr
- $(-1,413.0)
-
MMBtu
- -
05 2.3212: Optimize plant power factor $2,484 $7,500 - - $2,484 - - -
06 3.4116: Meter recycled water (to reduce sewer charges) $4,817 $6,709 - - - - $4,817
-
Tgal
-
TOTAL RECOMMENDED $385,648 $315,432 $(-16,612.0)
(-212,973)
kWh
$(-5,071.0)
-
kW-mo/yr
$2,484 $33,540
-
MMBtu
$4,817
-
Tgal
$366,490
TOTAL IMPLEMENTED $377,934 $300,362 $(-16,982.0)
(-217,720)
kWh
$(-5,114.0)
-
kW-mo/yr
- $33,540
-
MMBtu
- $366,490
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #2 Savings Water Disposal Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs