Assessment Year | 2016 |
---|---|
Principal Product | Commercial printing |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 113 |
Plant Area |
95,000
ft2
|
Annual Production | 13,500,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $494,779 | 7,455,600 |
kWh
|
$0.066 |
Electricity Demand | $38,066 | 16,411 |
kW-mo/yr
|
$2.32 |
Electricity Fees | $47,884 | - |
|
- |
Natural Gas | $81,352 | 13,194 |
MMBtu
|
$6.17 |
TOTAL YEARLY COSTS | $662,081 | |||
RECOMMENDED SAVINGS* | $55,796 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,380 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,005 | $35 |
$3,849
58,320
kWh
|
$155
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,485 | $1,000 |
$3,348
50,727
kWh
|
$137
-
kW-mo/yr
|
- | |
03 | 2.7261: Install timers and/or thermostats | $1,026 | $370 |
$390
5,914
kWh
|
- |
$636
-
MMBtu
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,151 | $8,250 |
$8,729
132,257
kWh
|
$422
-
kW-mo/yr
|
- | |
05 | 2.2443: Re-use or recycle hot or cold process exhaust air | $12,871 | $25,000 | - | - |
$12,871
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,276 | $29,625 |
$10,675
161,741
kWh
|
$601
-
kW-mo/yr
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $865 | $3,225 |
$865
13,104
kWh
|
- | - | |
08 | 2.7232: Replace existing hvac unit with high efficiency model | $13,118 | $56,700 |
$12,324
186,732
kWh
|
$793
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $55,796 | $124,205 |
$40,181
608,795
kWh
|
$2,109
-
kW-mo/yr
|
$13,506
-
MMBtu
|
||
TOTAL IMPLEMENTED | $9,380 | $4,630 |
$8,452
128,065
kWh
|
$292
-
kW-mo/yr
|
$636
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |