Assessment Year | 2016 |
---|---|
Principal Product | seat manufacturing for transit and Military |
NAICS | 336360: Motor Vehicle Seating and Interior Trim Manufacturing |
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 123 |
Plant Area |
120,508
ft2
|
Annual Production | 9,600
pieces
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $104,617 | 1,191,936 |
kWh
|
$0.088 |
Electricity Demand | $13,486 | 3,799 |
kW-mo/yr
|
$3.55 |
Electricity Fees | $9,848 | - |
|
- |
Natural Gas | $30,450 | 4,072 |
MMBtu
|
$7.48 |
TOTAL YEARLY COSTS | $158,401 | |||
RECOMMENDED SAVINGS* | $28,094 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $3,470 | $25 |
$3,470
39,431
kWh
|
- | - | |
02 | 2.7261: Install timers and/or thermostats | $2,422 | $50 |
$1,135
12,902
kWh
|
- |
$1,287
-
MMBtu
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,184 | $25 |
$1,142
12,973
kWh
|
$43
-
kW-mo/yr
|
- | |
04 | 2.7135: Install occupancy sensors | $3,716 | $725 |
$3,716
42,232
kWh
|
- | - | |
05 | 2.2437: Recover waste heat from equipment | $1,541 | $1,200 | - | - |
$1,541
-
MMBtu
|
|
06 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $928 | $2,300 |
$562
6,389
kWh
|
$366
-
kW-mo/yr
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $961 | $2,575 |
$961
10,920
kWh
|
- | - | |
08 | 2.7135: Install occupancy sensors | $1,518 | $6,016 |
$1,330
15,116
kWh
|
$188
-
kW-mo/yr
|
- | |
09 | 2.7232: Replace existing hvac unit with high efficiency model | $8,028 | $24,500 |
$7,528
85,540
kWh
|
$501
-
kW-mo/yr
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,325 | $18,675 |
$3,583
40,716
kWh
|
$742
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $28,094 | $56,091 |
$23,427
266,219
kWh
|
$1,839
-
kW-mo/yr
|
$2,827
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs