| Assessment Year | 2016 |
|---|---|
| Principal Product | seat manufacturing for transit and Military |
| NAICS | 336360: Motor Vehicle Seating and Interior Trim Manufacturing |
| SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 123 |
| Plant Area |
120,508
ft2
|
| Annual Production | 9,600
pieces
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $104,617 | 1,191,936 |
kWh
|
$0.088 |
| Electricity Demand | $13,486 | 3,799 |
kW-mo/yr
|
$3.55 |
| Electricity Fees | $9,848 | - |
|
- |
| Natural Gas | $30,450 | 4,072 |
MMBtu
|
$7.48 |
| TOTAL YEARLY COSTS | $158,401 | |||
| RECOMMENDED SAVINGS* | $28,094 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $3,470 | $25 |
$3,470
39,431
kWh
|
- | - | |
| 02 | 2.7261: Install timers and/or thermostats | $2,422 | $50 |
$1,135
12,902
kWh
|
- |
$1,287
-
MMBtu
|
|
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,184 | $25 |
$1,142
12,973
kWh
|
$43
-
kW-mo/yr
|
- | |
| 04 | 2.7135: Install occupancy sensors | $3,716 | $725 |
$3,716
42,232
kWh
|
- | - | |
| 05 | 2.2437: Recover waste heat from equipment | $1,541 | $1,200 | - | - |
$1,541
-
MMBtu
|
|
| 06 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $928 | $2,300 |
$562
6,389
kWh
|
$366
-
kW-mo/yr
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $961 | $2,575 |
$961
10,920
kWh
|
- | - | |
| 08 | 2.7135: Install occupancy sensors | $1,518 | $6,016 |
$1,330
15,116
kWh
|
$188
-
kW-mo/yr
|
- | |
| 09 | 2.7232: Replace existing hvac unit with high efficiency model | $8,028 | $24,500 |
$7,528
85,540
kWh
|
$501
-
kW-mo/yr
|
- | |
| 10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,325 | $18,675 |
$3,583
40,716
kWh
|
$742
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $28,094 | $56,091 |
$23,427
266,219
kWh
|
$1,839
-
kW-mo/yr
|
$2,827
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs