ITAC Assessment: LE0423
ITAC logo
ITAC Assessment: LE0423
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product seat manufacturing for transit and Military
NAICS 336360: Motor Vehicle Seating and Interior Trim Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 123
Plant Area 120,508
ft2
Annual Production 9,600
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $104,617 1,191,936
kWh
Electricity Demand $13,486 3,799
kW-mo/yr
Electricity Fees $9,848 -
Natural Gas $30,450 4,072
MMBtu
TOTAL YEARLY COSTS $158,401
RECOMMENDED SAVINGS* $28,094 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $3,470 $25 $3,470
39,431
kWh
- -
02 2.7261: Install timers and/or thermostats $2,422 $50 $1,135
12,902
kWh
- $1,287
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,184 $25 $1,142
12,973
kWh
$43
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $3,716 $725 $3,716
42,232
kWh
- -
05 2.2437: Recover waste heat from equipment $1,541 $1,200 - - $1,541
-
MMBtu
06 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $928 $2,300 $562
6,389
kWh
$366
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $961 $2,575 $961
10,920
kWh
- -
08 2.7135: Install occupancy sensors $1,518 $6,016 $1,330
15,116
kWh
$188
-
kW-mo/yr
-
09 2.7232: Replace existing hvac unit with high efficiency model $8,028 $24,500 $7,528
85,540
kWh
$501
-
kW-mo/yr
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $4,325 $18,675 $3,583
40,716
kWh
$742
-
kW-mo/yr
-
TOTAL RECOMMENDED $28,094 $56,091 $23,427
266,219
kWh
$1,839
-
kW-mo/yr
$2,827
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs